海外石油工程施工现场之土建工程

发表于 讨论求助 2023-05-10 14:56:27

土建工程

CIVIL ENGINEERING

1.All of the civil work on the field will be executed by us (our company).

所有现场的土建工作都将由我们(我公司)承担实施。

2.Civil engineering design is performed on our own at home.

土建工程是根据卖方提供的技术条件设计的。

3.This is a working (plot plan, vertical layout, structure plan, floor plan, general plan) drawing.

这是施工(平面布置、竖向布置、结构、屋间平面、总)图。

4.The quality of civil engineering conforms with our domestic technical standard (China National Building Code).

土建工程的质量符合我们国内的技术标准(中国建筑法规)。

5.Our civil work include construction of roads, buildings, foundations and reinforced concrete structure.

我们的土建工作包括建造道路、建筑物、基础和钢筋混凝土结构。

6.It will take two weeks to complete this building (foundation).

这房子(基础)需要两周时间才能完成。

7.Sand, brick, and stone are generally used in constructing houses.

砂、砖和石头通常用于建造房屋。

8.These are the anchor bolts (rivets, unfinished bolts, high-strength structural bolts) for the structure.

这是用于结构的锚定螺栓(铆钉、粗制螺栓、高强度结构用螺栓)。

9.The holes of anchor bolts will be grouted with normal (Portland, non-shrinkage) cement mortar.

这些地脚螺孔将灌入普通(波特兰,无收缩)水泥砂浆。

10.We usually measure the strength of concrete at 28 days after which has been cast.

我们通常在混凝土灌注后28天测定其强度。

11.The average compressive strength of samples is 500kg/cm2.

试样的平均抗压强度为500公斤/平方厘米。

12.Our concrete material is mixed in a rotating-drum batch mixer at the job site.

我们用的混凝土是在现场的间歇式转筒搅拌机中搅拌的。

13.Quality of concrete depends on proper placing, finishing, and curing.

混凝土的质量取决于适当的灌注、抹光和养护。

14.The workers tend to start the final finishing now.

工人们现在打算开始最后的抹光作业。

15.The concrete can be made stronger by pre-stressing in our factory.

在我们厂里可以使混凝土通过预加应力得到增强。

16.Most of construction material can be tested in our laboratory.

我们的实验室可以检验大部分建筑材料。

17.We shall finish the civil work by the end of the year.

在年底前我们将完成土建工作。

百通思达语言服务


电话:010-84931585(北京)

          0546-8780955(东营)

邮箱:info@petrostar.com.cn

          petrostar@188.com

网址:www.petrostar.cn



发表
26906人 签到看排名